Testing standards for energy storage battery certification in each region

That product you want is here​

Testing standards for energy storage battery certification in each region

Product Details

Certification form for energy storage battery

Country/region

Certification

Standard

Product

Mandatory or not

Europe

EU regulations

New EU battery rules

All kinds of battery

Mandatory

CE certification

EMC/ROHS

Energy storage system/battery pack

Mandatory

LVD

Energy storage system

Mandatory

TUV mark

VDE-AR-E 2510-50

Energy storage system

NO

North America

cTUVus

UL 1973

Battery system/cell

NO

UL 9540A

Cell/module/energy storage system

NO

UL 9540

Energy storage system

NO

China

CGC

GB/T 36276

Battery cluster/module/cell

NO

CQC

GB/T 36276

Battery cluster/module/cell

NO

IECEE

CB certification

IEC 63056

Secondary lithium cell/battery system for energy storage

NO

IEC 62619

Industrial secondary lithium cell/battery system

NO

 

 

IEC 62620

Industrial secondary lithium cell/battery system

NO

Japan

S-Mark

JIS C 8715-2: 2019

Cell, battery pack, battery system

NO

Korea

KC

KC 62619: 2019/ KC 62619: 2022

Cell, battery system

Mandatory

Australia

CEC Listing

--

Lithium battery energy storage system without converter (BS), battery energy storage system with converter (BESS)

 

no

Russia

Gost-R

Applicable IEC standards

Battery

Mandatory

Taiwan

BSMI

CNS 62619

CNS 63056

Cell, battery

Half-

compulsory

 

 

 

 

 

 

 

 

 

India

BIS

IS 16270

Photovoltaic lead-acid and nickel cell and battery

Mandatory

IS 16046 (Part 2):2018

Energy storage cell

Mandatory

IS 13252 (part 1): 2010

Power bank

Mandatory

IS 16242 (Part 1):2014

UPS functional products

Mandatory

IS 14286: 2010

Crystalline silicon photovoltaic modules for ground use

Mandatory

IS 16077: 2013

Thin film photovoltaic modules for ground use

Mandatory

IS 16221 (Part 2):2015

Photovoltaic system inverter

Mandatory

IS/IEC 61730 (part2): 2004

Photovoltaic module

Mandatory

Malaysia

SIRIM

Applicable International standards

Energy storage system products

no

Israel

SII

Applicable standards as set out in the regulations

Home photovoltaic energy storage System (Grid-connected)

Mandatory

Brazil

IMMETRO

ABNT NBR 16149:2013

ABNT NBR 16150:2013

ABNT NBR 62116:2012

Energy storage inverter (off-grid/grid-connected/hybrid)

Mandatory

NBR 14200

NBR 14201

NBR 14202

IEC 61427

Energy storage battery

Mandatory

Transportation

Transportation certificate

UN38.3/IMDG code

Storage cabinet/Container

Mandatory

 

MCM Advantage

  • High accuracy and high range equipment
  • Our equipment accuracy reaches ±0.05%. We can charge and discharge cells of 4000A, 100V/400A modules and 1500V/500A packs.
  • We have 12m3 walking in constant temperature and constant humidity chamber, 12m3  walking in compound salt spray chamber, 10m3  high and low temperature low pressure that can charge and discharge simultaneously, 12m3 walking in dust proof equipment and IPX9K, IPX6K water proof equipment.
  • Displacement accuracy of penetration & crush equipment reaches 0.05mm. There are also 20t electromagnetic vibration bench 20000A short circuit equipment.
  • We have cell thermal runaway test can, which also has the functions of gas collection and analysis. We also have place and equipment for thermal propagation test for battery modules and packs.
  • Global services and multi solutions:
  1. We provide systematic certification solution to help customers get into market quickly.
  2. We have cooperation with test and certification organizations of different countries. We can provide multiple solutions for you.
  3. We can provide technical support from product design to certification.
  4. We can manage different certification projects at the same time, by which we can help you save your samples, lead time and fee cost.
MORE INFORMATION

FAQ

The MOQ of fiber optic cable is 1km.
Firstly let us know your requirements or application. Secondly we quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production.
Yes,we have own factory,OEM is available.Please contact us and give me your design before our production.
Firstly,we use top quality raw material(best fiber and friendly sheath material etc),Then surveyor will do the test,such as raw material quality test,fiber optic attenuation test and high or low temperature test etc.
We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation.Please call us or tell us in your mail, so that we could regard your inquiry priority.
Over 20000 square meters.More than 26 productions lines in total,About 300 well-trained staff and engineers.

Get In Touch for More Information