Battery Pse Technical Requirement Lead Time – Japan- PSE – MCM

Short Description:


Project Instruction

Products tags

Related Video

Feedback (2)

as a CBTL approved by the IECEE CB system, the application for test of CB certification can be conducted in MCM. Iec 62133 Testing Laboratory , Ctia Specification , En 62133 Test Method , MCM can provide one-stop service from sample delivery to factory inspection to certification, with assistance of experienced engineers in the whole process.
Battery Pse Technical Requirement Lead Time – Japan- PSE – MCM Detail:

▍What is PSE Certification?

PSE (Product Safety of Electrical Appliance & Material) is a mandatory certification system in Japan. It is also called ‘Compliance Inspection’ which it is a mandatory market access system for electrical appliance. PSE certification is composed of two parts: EMC and product safety and it is also an important regulation of Japan safety law for electrical appliance.

▍Certification Standard for lithium batteries

Interpretation for METI Ordinance for Technical Requirements(H25.07.01), Appendix 9,Lithium ion secondary batteries

▍Why MCM?

● Qualified facilities: MCM is equipped with qualified facilities which can be up to the whole PSE testing standards and conduct tests including forced internal short circuit etc. It enables us to provide different customized testing reports in the format of JET, TUVRH, and MCM etc.

● Technical support: MCM has a professional team of 11 technical engineers specialized in PSE testing standards and regulations, and is able to offer the latest PSE regulations and news to clients in a precise, comprehensive and prompt way.

● Diversified service: MCM can issue reports in English or Japanese to meet clients’ need. So far, MCM has completed over 5000 PSE projects for clients in total.


Product detail pictures:

Battery Pse Technical Requirement Lead Time –  Japan- PSE – MCM detail pictures


Related Product Guide:

MCM has hired a former senior BIS official in India as a certification consultant, removing the risk of cancellation of registration number, to help to secure the projects. Battery Pse Technical Requirement Lead Time – Japan- PSE – MCM , The product will supply to all over the world, such as: Moldova, Madrid, Philadelphia, MCM has reached mutual recognition of test data with Indian laboratories, witness test can be conducted in MCM lab without sending samples to India.
  • It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Tina from South Korea - 2017.08.18 11:04
    The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Muriel from Borussia Dortmund - 2017.08.18 18:38
    Write your message here and send it to us