Featured

Browse by: All
  • Battery Ce Requirement –  EU- CE – MCM

    Battery Ce Requirement – EU- CE – MCM

    ▍What is CE Certification? The CE mark is a “passport” for products to enter the EU market and the EU Free Trade Association countries market. Any stipulated products (involved in the new method directive), whether manufactured outside the EU or in EU member states, in order to circulate freely in the EU market, they must be in compliance with the requirements of the directive and relevant harmonized standards before being placed on the EU market , and affix the CE mark. This...
  • Lithium Battery Is 16046 Technical Documents Service –  Vietnam- MIC – MCM

    Lithium Battery Is 16046 Technical Documents Service – Vietnam- MIC – MCM

    ▍Vietnam MIC Certification Circular 42/2016/TT-BTTTT stipulated that batteries installed in mobile phones, tablets and notebooks are not allowed to be exported to Vietnam unless  they are subjected to DoC certifctaion since Oct.1,2016. DoC will also be required to provide when applying Type Approval for end products (mobile phones, tablets and notebooks). MIC released new Circular 04/2018/TT-BTTTT in May,2018 which stipulates that no more IEC 62133:2012 report issued by overseas accredit...
  • Lithium Battery Battery Korea Certificate –  Korea- KC – MCM

    Lithium Battery Battery Korea Certificate – Korea- KC – MCM

    ▍What is KC? Since 25th Aug., 2008,Korea Ministry of Knowledge Economy (MKE) announced that the National Standard Committee will conduct a new national unified certification mark — named KC mark replacing Korean Certification during the time between Jul. 2009 and Dec. 2010. Electrical Appliances safety certification scheme (KC Certification) is a mandatory and self-regulatory safety confirmation scheme according to Electrical Appliances Safety Control Act, a scheme which certified...
  • Un38.3 Testing Service –  –  Transport- UN38.3 – MCM

    Un38.3 Testing Service – – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Battery Ctuvus Technical Requirement Lead Time –  America, Canada- cTUVus&ETL – MCM

    Battery Ctuvus Technical Requirement Lead Time – America, Canada- cTUVus&ETL – MCM

    ▍What is cTUVus & ETL CERTIFICATION? OSHA (Occupational Safety and Health Administration), affiliated to US DOL (Department of Labor), demands that all products to be used in workplace must be tested and certificated by NRTL before being sold in market. Applicable testing standards include American National Standards Institute (ANSI) standards; American Society for Testing Material (ASTM) standards, Underwriter Laboratory (UL) standards, and factory mutual-recognition organization st...
  • Lithium Battery Indian Crs Quotation Lead Time –  India – CRS – MCM

    Lithium Battery Indian Crs Quotation Lead Time – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...
  • Lithium Battery Ce Testing Service Certification –  EU- CE – MCM

    Lithium Battery Ce Testing Service Certification – EU- CE – MCM

    ▍What is CE Certification? The CE mark is a “passport” for products to enter the EU market and the EU Free Trade Association countries market. Any stipulated products (involved in the new method directive), whether manufactured outside the EU or in EU member states, in order to circulate freely in the EU market, they must be in compliance with the requirements of the directive and relevant harmonized standards before being placed on the EU market , and affix the CE mark. This...
  • Battery Cqc Technical Documents Lead Time –  China- CQC – MCM

    Battery Cqc Technical Documents Lead Time – China- CQC – MCM

    ▍Certification Overview Standards and Certification Document Test standard: GB31241-2014: Lithium ion cells and batteries used in portable electronic equipment―Safety requirements Certification document: CQC11-464112-2015: Secondary Battery and Battery Pack Safety Certification Rules for Portable Electronic Devices   Background and Date of implementation 1. GB31241-2014 was published on December 5th, 2014; 2. GB31241-2014 was mandatorily implemented on August 1st, 2015. ; 3. On October 1...
  • Lithium Battery Eac Technical Documents Lead Time –  Customs Union- EAC, GOST-R – MCM

    Lithium Battery Eac Technical Documents Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Un38.3 Test Methods Service –  –  Transport- UN38.3 – MCM

    Un38.3 Test Methods Service – – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Lithium Battery Ctuvus Certification Procedure Lead Time –  America, Canada- cTUVus&ETL – MCM

    Lithium Battery Ctuvus Certification Procedure Lead Time – America, Canada- cTUVus&ETL – MCM

    ▍What is cTUVus & ETL CERTIFICATION? OSHA (Occupational Safety and Health Administration), affiliated to US DOL (Department of Labor), demands that all products to be used in workplace must be tested and certificated by NRTL before being sold in market. Applicable testing standards include American National Standards Institute (ANSI) standards; American Society for Testing Material (ASTM) standards, Underwriter Laboratory (UL) standards, and factory mutual-recognition organization st...
  • Malaysia Sirim Technical Requirement Service –  Malaysia- SIRIM – MCM

    Malaysia Sirim Technical Requirement Service – Malaysia- SIRIM – MCM

    ▍SIRIM Certification For the security of person and property, Malaysia government establishes product certification scheme and puts surveillance on electronic appliances, information & multimedia and construction materials. Controlled products can be exported to Malaysia only after obtaining product certification certificate and labeling.  ▍SIRIM QAS SIRIM QAS, a wholly-owned subsidiary of the Malaysian Institute of Industry Standards, is the only designated certification unit o...